TE Connectivity Titan
Project Overview
A 50,000 SF expansion of an active manufacturing plant to increase production capacity.
The Challenge
Connecting to the existing structure without disrupting 24/7 production lines and sensitive electronic manufacturing processes.
The Solution
Built temporary dust walls and positive pressure zones to isolate the construction area completely, allowing the plant to maintain full output during construction.